banner

Car part plastic injection mold/high precision mold manufacturers plastic injection mold making

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-26 04:47

  • Browse the number:

    43

Send an inquiries
Company Profile
Tech Mould Co. Ltd
By certification [File Integrity]
Contact:

tech-mould(Mr.)  

Telephone:

Area:

Beijing

Address:

D unit 1702 square Zhongke, Innovation Research Center, the 2th road Songshan Lake, Dongguan, Guangdong, China (523000)

Website: http://tech-mould.netgagerdesign.com/
Product details
Model Number: T164470 Brand Name: TECH Key Specifications/Special Features: Mold description:SGS certification1. Steel of cavity and core: 23442. Mold base: LKM3. Cavity: 1x1Cavity4. Mold gate way: Yudo hot runner5. Cooling system: Enough cooling6. Surface: Mirror polishing7. Tolerance: 0.02mm, 2D/3D control8. Mold life: 1, 000, 000 shots9. Finished time for first sample: 40 days.
Key specifications/special features:

In order to make sure doff automatic and without any eject mark, must be arrange high polish for this plastic injection mold/mold. This rack choose PP material, then advice choose hard enough steel
1. Customized designs, sizes and frames are accepted
2. Mold steel: NAK80 forging for cor and cav, LKM for mold base (customized)
3. Mold treatment: Final treatment for cor and cav plates by vacuum quenching to 38 to 42deg; (whole plates 0.3mm hardness)
4. Mold cavity: 1*1
5. Mold software: Choose UG for 3D design, AutoCAD for 2D drawing, mold flow for runner analyze

6. Mold size: 600 x 500mm (depends on client's machine upon changing mold size)
7. Mold fix machine: 350T on injection molding machine
8. Plastic material: PP (on normal choose PP)
9. Mold cycle time: 32 seconds/shot (without cool water when test this mold)
10. Mold doff way: Automatic by ejectors and air spring (Hasco standard)
11. Mold lifespan (minimum): 1, 000, 000 shots

12. Mold base: Copy standard mold base
13. Mold gate way: Hot runner (customized)
14. Mold packing: Standard wooden case
15. Minimum mold order should be one set
16. Mold shipment will be arranged within seven days after confirming the samples and received balance
17. After product, if needs long time stay, should put oil (butter mix benzene) on the cor and cav, slider's surface prevents rust, with free spare parts during mold minimum life and technical Aegis.
Shipping Information:
  • FOB Port: Shenzhen
  • Lead Time: 20 - 45 days
Main Export Markets:
  • Asia
  • Australasia
  • Central/South America
  • North America
  • Western Europe
New Products