Plastic Plywood formwork
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Hebei
- Validity to:
Long-term effective
- Last update:
2020-09-16 04:12
- Browse the number:
229
- Hebei Mortmain Rubber and Plastic Technology Co., Ltd By certification [File Integrity]
-
Contact:
mortmain(Mr.)
- Email:
- Telephone:
- Phone:
-
Area:
Hebei
-
Address:
Chen Quan Industrial Zone, Xian County, Cangzhou City, Hebei Province
- Website: http://www.mtmformwork.com/ http://mortmain.netgagerdesign.com/
Product details
Thickness(mm) |
Length*Width(mm) |
Weight(kg) |
12 |
1220*2440 |
22-23 |
15 |
1220*2440 |
26-27 |
16 |
1220*2440 |
28-29 |
18 |
1220*2440 |
32-33 |
The comparison between plastic formwork and aluminium formwork
1, The aluminum alloy template must be used in standard high rise buildings, in order to reduce the use of costs (construction of a single building below 30 floors is not suggested, only if the phased construction);
2, Every thing must be very accurate whether in the design, or the needs of the owners of the structural drawings and construction drawings if using aluminum alloy template; in addition, size can not be modified; ( while plastic formwrk can be cut according to the need. )
3, One-time investment is high, very expensive.
4, The surface of concrete and aluminum will play a chemical reaction and the plate will not be smooth after several times. small bubbles appear.
5, Aluminum template is not available for the basement construction.
http://www.mtmformwork.com/
-
FAG Deep Groove Ball Bearing
price: Negotiable
-
Plastic Float Switch
price: Negotiable
-
Wood Insert Nut
price: Negotiable
-
Immersion Suit Test Kit
price: Negotiable
-
Alloy Steel Pipes
price: Negotiable
-
Link Conveyors
price: Negotiable